Skip to content
1 Candiano Popescu Street, 4th District, Bucharest, Romaniaoffice@emfor.ro021.336.01.20
Emfor Montaj S.A.
Building your future
Emfor Montaj S.A.
  • Home
  • About
  • Services
    • Special Foundations
    • Horizontal Drilling
    • Foundation Reinforcement
    • Residential Homes and Buildings
    • Electrical Sub-Stations
    • Ground Treatment and Improvement
  • Portfolio
  • Contact
Search:
  • Home
  • About
  • Services
    • Special Foundations
    • Horizontal Drilling
    • Foundation Reinforcement
    • Residential Homes and Buildings
    • Electrical Sub-Stations
    • Ground Treatment and Improvement
  • Portfolio
  • Contact

Author Archives: Bogdan

You are here:
  1. Home
  2. Article author Bogdan
ZoomDetails

OPL 400kV d.c. Connection to Medgidia South PowerStation – 2nd Stage

In ProgressBy BogdanNovember 26, 2022

OPL 400kV d.c. Connection to Medgidia South PowerStation – 2nd Stage Beneficiary: CN Transelectrica SA Category: Drilling, Foundations, Powerlines Date: November 2022 Works of foundations on bored piles, using multiple Bauer Drilling Rigs at the same time. The project is part of Romania’s 400kV power transmission ring. Foundation on Bored piles Ø 880 mm – 97…

ZoomDetails

Sustainable urban mobility Corridor in Emanuil Gojdu Square – Oradea

In ProgressBy BogdanSeptember 16, 2022

Sustainable urban mobility Corridor in Emanuil Gojdu Square – Oradea Beneficiary: Oradea County Council Category: Drilling Date: September 2022 Works of bored piles for the overhead passage’s abutments in Oradea using 3 Bauer Drilling Rigs at the same time. Bored piles Ø 880 mm h 15 m – 950 pcs.

ZoomDetails

Construction of a residential complex S+P+10E+Duplex Iasi – Romania

FinalizedBy BogdanMarch 29, 2022

Construction of a residential complex S+P+10E+Duplex Iasi – Romania Beneficiary: Private Company Category: Drilling, Special Foundations and related services Date: March 2022 Land stabilization with bored piles for a residential complex. Bored piles Ø 620 mm h 19.5m – 109 pcs.Bored piles Ø 620 mm h 22m – 8 pcs.Bored piles Ø 620 mm h 24m…

ZoomDetails

OPL 400 kV double circuit Gutinas – Smardan, Romania

In ProgressBy BogdanMarch 7, 2022

Overhead Power Lines 400 kV double circuit Gutinas – Smardan, Galati-Buzau-Vrancea counties, Romania Beneficiary: CN Transelectrica SA Category: Drilling and foundations Date: February 2022 Foundations on bored piles in a project that takes place in three different counties, with over 100 people using 4 drilling rigs and a dozen other machines at the same time…

ZoomDetails

Overhead passage Turnu Magurele X Metalurgiei X Alexandru Obregia Intersection, Bucharest

FinalizedBy BogdanFebruary 17, 2022

Overhead passage Turnu Magurele X Metalurgiei X Alexandru Obregia Intersection, Bucharest Beneficiary: City Hall 4th District Category: Drilling Date: February 2022 Works of bored piles for the overhead passage’s abutments and piers in Bucharest using a Bauer BG36H Drilling rig. Bored piles Ø 1500 mm h 27 m – 32pcs.

ZoomDetails

Design and execution of the bypass of Zalau municipality between DN1F, km 79 + 625 – DJ 191C

In ProgressBy BogdanAugust 17, 2021

Design and execution of the bypass of Zalau municipality between DN1F, km 79 + 625 – DJ 191C Beneficiary: C.N.A.I.R. Category: Drilling Date: In progress Execution of columns of granular material and execution of bored piles with recoverable tubing D 620mm / 880mm / 1200mm Bored piles Ø 880 mm h 9-12 m – 92…

ZoomDetails

Construction of a residential complex 2S+P+7E+8+9 Bucharest – Romania

FinalizedBy BogdanAugust 17, 2021

Construction of a residential complex 2S+P+7E+8+9 Bucharest – Romania Beneficiary: Private company Category: Drilling Date: In progress Land stabilization with bored piles for a residential complex Bored piles Ø 620 mm h 14,5 m – 300 pcs.

ZoomDetails

Building of a shopping center at KABA 2000 standard Iasi – Romania

FinalizedBy BogdanAugust 5, 2021

Building of a shopping center at KABA 2000 standard Iasi – Romania Beneficiary: Kaufland Romania SCS Category: Drilling Date: In progress Works of bored piles and foundations using 3 drilling installations on site Bored piles Ø 880mm h 11.5 m – 40 pcs.Bored piles Ø 620mm h 11 m – 270 pcs.

ZoomDetails

Design and execution of the Bucharest Ring-road

FinalizedBy BogdanMay 24, 2021

Design and execution of the Bucharest Ring-road km 0+000-km 100+900, Lot 2 km 69+000-km 85+300 Beneficiary: C.N.A.I.R. Category: Drilling, foundations Date: May 2021 Relocation of high-voltage power lines along the new route of the ring-road as well as elevation of the power lines. Bored piles Ø 1080 h 12.5 m – 256 pcs.Foundations on bored…

ZoomDetails

Construction of a mixed-function building complex, housing, services and trade S+P+10E

FinalizedBy BogdanMay 24, 2021

Construction of a mixed-function building complex, housing, services and trade S+P+10E Beneficiary: Private company in Romania Category: Drilling, land development Date: April 2021 Stabilization of land with bored piles for a residential complex using 3 drilling rigs installation at the same time for efficiency Bored piles Ø 620 h 14 m – 333 pcs.

→12→
  • Termeni si conditii
  • Politica de confidentialitate
  • Cookies
Footer menu

021.336.01.20 office@emfor.ro

Go to Top