OPL 400kV d.c. Connection to Medgidia South PowerStation - 2nd Stage
Beneficiary: CN Transelectrica SA
Category: Drilling, Foundations, Powerlines
Date: November 2022
Works of foundations on bored piles, using multiple Bauer Drilling Rigs at the same time. The project is part of Romania’s 400kV power transmission ring.
Foundation on Bored piles Ø 880 mm – 97 foundations / 388 Bored Piles