Overhead Power Lines 400 kV double circuit Gutinas - Smardan, Galati-Buzau-Vrancea counties, Romania
Beneficiary: CN Transelectrica SA
Category: Drilling and foundations
Date: February 2022
Foundations on bored piles in a project that takes place in three different counties, with over 100 people using 4 drilling rigs and a dozen other machines at the same time to reach the deadline. This project is funded through The Operational Programme for Large Infrastructure (POIM) from the European Union focusing on sustainable growth by promoting a low carbon consuming economy by applying energy efficiency measures and promoting green energy, as well as environmentally friendly transportation means and an efficient use of resources.
Bored piles Ø 1200 mm h 12 m – 1780 pcs.
Over 330 foundations for high voltage electric pillars